The DIN 276 German Institut for standardization of the registered association regulates the cost calculation in the above ground construction.
An older version of the DIN 276 from the year 1981 is used in accordance with HOAI for fee determination (more exactly said to the determination of the costs to be taken into account).
In the DIN 276 1993-06 different kinds of the cost calculation and the cost breakdown are essentially specified. It differentiates with increasing accuracy into the cost estimation, cost calculation, preliminary cost estimate and according to conclusion of the task of building into the cost statement.
Coherent costs are arranged into cost elements. In the 1. Even ones of the cost breakdown are called, arranged the total costs into the following seven cost elements, also hundred costs: 100 property 200 preparing and opening 300 Building constructions 400 Technical plants 500 exterior installations 600 equipment and works of art 700 building additional expenses
For the more exact cost calculation costs become into the 2. Even one, still more exactly in 3. Even one classified. Excerpt 300er costs:
360 roofs (2.Ebene)
The numbering is not sequential, but exhibits gaps.